top of page
Transit
Caption 2

An integrated system for managing public transportation disruptions

Transit
Caption 2

An integrated system for managing public transportation disruptions

PROJECT |

Personal

ROLE |

UX/UI, Prototyping

YEAR |

2025

Overview

Transit was created and based on a Ministry of Transport project I am a part of.
The goal of the project is to enhance public transportation by providing real-time information on traffic disruptions that cause route changes and delays.

Managed by the Ministry of Transport, its success depends on seamless communication with transportation operators to keep the public informed and ensure smooth travel.

INTEREST IN COLLABORATING

Ministry of Transport

Line 57

Receiving direct
information about
traffic disruptions

Interest 3

Operators

Line 57

Cancellation and
prevention of fines
due to route change

Overview

Transit was created and based on a Ministry of Transport project I was a part of.
The goal of the project is to enhance public transportation by providing real-time information on traffic disruptions that cause route changes and delays.

Managed by the Ministry of Transport, its success depends on seamless communication with transportation operators to keep the public informed and ensure smooth travel.

INTEREST IN COLLABORATING

Ministry of Transport

Receiving direct
information about
traffic disruptions

Interest mobile.png
Interest 4

Operators

Cancellation and
prevention of fines
due to route change

Main Work Flow

AN EVENT LOG IS MANAGED BY A MINISTRY OF TRANSPORT COORDINATOR,

EVENT DETAILS ARE BEING REVIEWED IN COLLABORATION WITH OPERATORS

Every event requires time and effort, and when there are several at once, with the need to complete them quickly, it can be stressful

Notify of public
transportation disruptions

From operators, municipal
authorities, police and more

40 Arrow 1
40 Arrow 2

Verify event details

Reliability of reference, location,
duration, type of disruptions

40 Arrow 1

Decline event

40 Arrow 2
40 Arrow 2

Open new event

Pros 3

Identify the effects

Pros 2

Publish public alerts

Approve event

MOT Coordinator

Notify of public
transportation disruptions

From operators, municipal
authorities, police and more

40 Arrow 1
40 Arrow 2

Verify event details

Reliability of reference, location,
duration, type of disruptions

40 Arrow 1

Decline event

40 Arrow 2
40 Arrow 2

Open new event

Pros 3

Identify the effects

Pros 2

Publish public alerts

Approve event

MOT Coordinator

Notify of public
transportation disruptions

From operators, municipal
authorities, police and more

Diagram arrow.png

MOT Coordinator

Diagram arrow.png

Verify event details

Reliability of reference, location,
duration, type of disruptions

Diagram arrow.png

Decline event

OR

Or line.png

Approve event

Diagram arrow.png

Open new event

Pros 2

Identify the effects

Pros 2

Publish public alerts

Main Work Flow

AN EVENT LOG IS MANAGED BY A MINISTRY OF TRANSPORT COORDINATOR,
EVENT DETAILS ARE BEING REVIEWED IN COLLABORATION WITH OPERATORS

Every event requires time and effort, and when there are several at once, with the need to complete them quickly, it can be stressful

40 Arrow 1

Decline event

MOT Coordinator

40 Arrow 2
40 Arrow 2

Verify event details

Reliability of reference, location,
duration, type of disruptions

Approve event

40 Arrow 2

Open a new event

Pros 3

Identify the effects

Pros 2

Publish public alerts

40 Arrow 1

Notify of public
transportation disruptions

From operators, municipal
authorities, police and more

Current State of work

MULTIPLE UNRELATED SYSTEMS AND SOFTWARE ARE BEING USED IN THIS PROJECT

Pristo

Moran

Transit

Moran system is used for public alerts and Transit is a public transportation map. Both are Ministry of Transport systems.

Pristo is an external system used for managing the event log.

Pristo

Moran

Transit

Moran system is used for public alerts and Transit is a public
transportation map. Both are Ministry of Transport systems

Pristo is an external system used for managing the event log

Screen 1.jpg
Screen 2.jpg

Many other systems serve a variety of different purposes, actions, and functions;
Whatsapp, Exel, Outlook, Avigilion cameras, Google Maps, Bus Nearby, ISR Transit, and more

Many other systems serve a variety of different purposes, actions, and functions;
Whatsapp, Exel, Outlook, Avigilion cameras, Google Maps, Bus Nearby, ISR Transit...

The Challenges

THE CURRENT STATE OF WORK IS DISORGANIZED AND INEFFICIENT.
WHEN DEALING WITH LIVE EVENTS RESPONSE TIME IS CRUCIAL.

1.

Using multiple unrelated systems interrupts workflow continuity

2.

The available software and systems are not suited to the required tasks
resulting in time-consuming, clumsy execution with many unnecessary extra steps

2.

The available software and systems are not suited to the required tasks resulting in time-consuming, clumsy execution with many unnecessary extra steps

3.

Tasks are handled at a low level due to inaccurate information, often requiring rework

4.

Users often encounter system crashes that disrupt their work and leave them frustrated

User’s Take

Here are some questions & answers from a questionnaire I posted among users,
including both MOT Coordinators and Operators' Representatives

USERS CONSISTENTLY HIGHLIGHTED KEY ISSUES,
EMPHASIZING THE ESSENTIAL FACTORS FOR THIS WORK:

Time 1

 Time Efficiency

Quick and effective task completion

Info 1

Info Accessibility

Easy access to relevant data

System 1

System Reliability

Minimizing errors and ensuring stability

The map doesn't display
bus traffic clearly, leaving
road status unclear

It takes too long from
reporting the incident
to full verification

Determining if a report is
relevant and meets the
event opening criteria

What problems do you face when


checking traffic distruptions?
filling out event details?
publishing public alerts?
checking traffic distruptions?

What problems do you face when

What problems do you face when

User’s Take

Here are some questions & answers from a questionnaire I posted among users,
including both MOT Coordinators and Operators' Representatives

USERS CONSISTENTLY HIGHLIGHTED KEY ISSUES, EMPHASIZING THE ESSENTIAL FACTORS FOR THIS WORK:

Time 1

 Time Efficiency

Quick and effective task completion

Info 1

Info Accessibility

Easy access to relevant data

System 1

System Reliability

Minimizing errors and ensuring stability

Time 1

 Time Efficiency

Quick and effective task completion

Info 1

Info Accessibility

Easy access to relevant data

System 1

System Reliability

Minimizing errors and ensuring stability

User’s Take

Here are some questions & answers from a questionnaire I posted among users,
including both MOT Coordinators and Operators' Representatives

What problems do you face when

The map doesn't display
bus traffic clearly, leaving
road status unclear

It takes too long from
reporting the incident
to full verification

Determining if a report is
relevant and meets the
event opening criteria

checking traffic disruptions?

The map doesn't display
bus traffic clearly, leaving
road status unclear

It takes too long from
reporting the incident
to full verification

Determining if a report is
relevant and meets the
event opening criteria

filling out event details?

Map search is inaccurate,
requiring the use of
additional applications

If it is a large event,
it takes a long time to
fill out records

Event form cannot be
completed when the
map is not working

publishing public alerts?

There are difficulties with
response times due to
technological limitations

Clumsy and inconsistent
system with slow
processing times

There is no convenient
or quick way to lengthen
or shorten an alert

Map search is inaccurate,
requiring the use of
additional applications

If it is a large event,
it takes a long time to
fill out records

Event form cannot be
completed when the
map is not working

There are difficulties with
response times due to
technological limitations

Clumsy and inconsistent
system with slow
processing times

There is no convenient
or quick way to lengthen
or shorten an alert

What problems do you face when

filling out event details?

The map doesn't display
bus traffic clearly, leaving
road status unclear

It takes too long from
reporting the incident
to full verification

Determining if a report is
relevant and meets the
event opening criteria

What problems do you face when

publishing public alerts?

The map doesn't display
bus traffic clearly, leaving
road status unclear

It takes too long from
reporting the incident
to full verification

Determining if a report is
relevant and meets the
event opening criteria

USERS CONSISTENTLY HIGHLIGHTED KEY ISSUES, EMPHASIZING THE ESSENTIAL FACTORS FOR THIS WORK:

Time 1

 Time Efficiency

Quick and effective task completion

Info 1

Info Accessibility

Easy access to relevant data

System 1

System Reliability

Minimizing errors and ensuring stability

Time 1

 Time Efficiency

Quick and effective task completion

Info 1

Info Accessibility

Easy access to relevant data

System 1

System Reliability

Minimizing errors and ensuring stability

The Goal

I AIMED TO DESIGN AN EASY AND INTUITIVE FLOW THAT SAVES TIME AND SIGNIFICANTLY IMPROVES EFFICIENCY BY:

Creating a single unified system

Tailoring system navigation to user flow

Customizing features to enhance functionality

The Solution

I decided to focus on the Coordinator's side, as this role manages the event log and has full access to the system. The typical scenario involves receiving a real-time event request from an Operator, which then needs to be reviewed.

I decided to focus on the Coordinator's side, as this role manages the event log and has full access to the system.

 

The typical scenario involves receiving a real-time event request from an Operator, which then needs to be reviewed.

01

Dashboard

THE STATUS OF THE WORK CAN BE ASSESSED AT A GLANCE, ALLOWING FOR A QUICK DIVE INTO THE TASKS

Home page 1

TASKS ARE DISPLAYED BY URGENCY AND CAN BE MANAGED DIRECTLY FROM THE DASHBOARD

Time-sensitive alerts for events requiring reexamination

Real-time/future event requests submitted by Operators

Tasks added by Coordinators or higher-level managers

01 Tasks 1

Time-sensitive alerts for events requiring reexamination

Tasks 1.png

Real-time/future event requests submitted by Operators

Tasks 2.png

Tasks added by Coordinators or higher-level managers

Tasks 3.png

EVENTS MAP IS A VISUAL OVERVIEW OF EVENTS LOCATIONS, WITH QUICK ACCESS TO ESSENTIAL DETAILS

These map features are intentionally limited;
from event overview, you can access the full map and event
details by clicking on the location and event number

Layers
Events map Layers 1
Zoom in-out
Location Focus 2

Real-time events are automatically
displayed due to their importance

Focuses on the displayed events

Event Map 3

EVENTS MAP IS A VISUAL OVERVIEW OF EVENTS LOCATIONS, WITH QUICK ACCESS TO ESSENTIAL DETAILS

These map features are intentionally limited; from event overview, you can access the full map and event details by clicking on the location and event number

Event Map 3

Real-time events are automatically displayed due to their importance

Map features.png

Focuses on the displayed events

01

Dashboard

THE STATUS OF THE WORK CAN BE ASSESSED AT A GLANCE, ALLOWING FOR A QUICK DIVE INTO THE TASKS

The Solution

I decided to focus on the Coordinator's side, as this role manages the event log and has full access to the system. The typical scenario involves receiving a real-time event request from an Operator, which then needs to be reviewed.

I decided to focus on the Coordinator's side, as this role manages the event log and has full access to the system.

 

The typical scenario involves receiving a real-time event request from an Operator, which then needs to be reviewed.

Home page 1

TASKS ARE DISPLAYED BY URGENCY AND CAN BE MANAGED DIRECTLY FROM THE DASHBOARD

Time-sensitive alerts for events requiring reexamination

Real-time/future event requests submitted by Operators

Tasks added by Coordinators or higher-level managers

01 Tasks 1

Time-sensitive alerts for events requiring reexamination

Tasks 1.png

Real-time/future event requests submitted by Operators

Tasks 2.png

Tasks added by Coordinators or higher-level managers

Tasks 3.png

EVENTS MAP IS A VISUAL OVERVIEW OF EVENTS LOCATIONS, WITH QUICK ACCESS TO ESSENTIAL DETAILS

These map features are intentionally limited; from event overview, you can access the full map and event details by clicking on the location and event number

Event Map 3

Real-time events are automatically displayed due to their importance

Map features.png

Focuses on the displayed events

01

Dashboard

THE STATUS OF THE WORK CAN BE ASSESSED AT A GLANCE, ALLOWING FOR A QUICK DIVE INTO THE TASKS

02

Messages / Event Requests

EVENT REQUESTS ARE SUBMITTED AS COMPLETE FORMS, INCLUDING ALL REQUIRED EVENT DETAILS

Messages 3

NOTIFYING COORDINATORS OF SIMILAR EVENT REQUESTS SAVES TIME AND MINIMIZES STRESS

A notification appears for similar event requests when the system detects a match in location or both location and event type

Similar event requests 2

The event start time is set when the
request is opened and depends on
completing the form within 15 mins

Event Card 2
Event card lins 1

On click

Event Card 4
Event card arrow 2

02

Messages / Event Requests

EVENT REQUESTS ARE SUBMITTED AS COMPLETE FORMS, INCLUDING ALL REQUIRED EVENT DETAILS

Messages 3

NOTIFYING COORDINATORS OF SIMILAR EVENT REQUESTS SAVES TIME AND MINIMIZES STRESS

A notification appears for similar event requests when the system detects a match in location or both location and event type

Similar event requests 2

The event start time is set when the request is opened and depends on completing the form within 15 mins

Event Card 4
On click arrow.png

On click

Event Card 2
Map Animation 2

03

Map

THE MAP IS THE MAIN COMPONENT OF THE SYSTEM,
INCLUDING ALL RELEVANT DATA ABOUT ROUTES, LINES, AND STATIONS

Location search / Layers > Stops

Map 2 6

Polygon search > Lines > Route direction

Map 1

FEATURES ARE ONE CLICK AWAY AND CUSTOMIZED TO WORK NEEDS

A variety of relevant layer options

first click focuses on location,
second click focuses on polygon

Live bus tracking and trip recovery

Polygon/rectangle marking for search

Erase marked polygon or rectangle

Layers
Zoom in-out
Location Focus 2
Live buses 1
Polygon 9
Rectangle
Eraser 1

Entering a stop number shows results,
even when the search is set to location

Location Search 1
Location Search line 1

ALTERNATIVE ROUTES ARE SUGGESTED BASED ON PRECISE BLOCKAGES

After approving an alternative route, the system updates affected stations and generates an alert for the traveling public

Route direction 1
Map Animation 2

03

Map

THE MAP IS THE MAIN COMPONENT OF THE SYSTEM, INCLUDING ALL RELEVANT DATA ABOUT ROUTES, LINES, AND STATIONS

Location search / Layers > Stops

Map 2 6

Polygon search > Lines > Route direction

Map 1

FEATURES ARE ONE CLICK AWAY AND CUSTOMIZED TO WORK NEEDS

Map features expanded.png

A variety of relevant layer options

first click focuses on location,
second click focuses on polygon

Live bus tracking and trip recovery

Polygon/rectangle marking for search

Erase marked polygon or rectangle

Location Search mobile.png

Entering a stop number shows results,
even when the search is set to location

ALTERNATIVE ROUTES ARE SUGGESTED BASED ON PRECISE BLOCKAGES

After approving an alternative route, the system updates affected stations and generates an alert for the traveling public

Route direction 1

04

Events

WHERE EVENT DETAILS ARE MANAGED AND DOCUMENTED

Events 1

AS THE EVENT END TIME APPROACHES IT WILL TURN YELLOW OR RED
AND AN ALERT WILL APPEAR IN TASKS

The duration of public alerts is determined by the event's start and end times,
which can be extended or shortened based on the situation

Events 2

04

Events

WHERE EVENT DETAILS ARE MANAGED AND DOCUMENTED

Events 1

AS THE EVENT END TIME APPROACHES IT WILL TURN YELLOW OR RED AND AN ALERT WILL APPEAR IN TASKS

The duration of public alerts is determined by the event's start and end times, which can be extended or shortened based on the situation

Events features.png
40 Arrow 1
Diagram arrow.png
Decline Event
40 Arrow 1
40 Arrow 2
MOT Coordinator
Verify 1

Verify event details

Reliability of reference, location,
duration, type of disruptions

40 Arrow 2
40 Arrow 2
Approve Event
Identify 1

Open a new event

Pros 3
Identify 1

Identify the effects

Pros 2
Identify 1

Publish public alerts

Notify 2

Notify of public
transportation disruptions

From operators, municipal
authorities, police and more

40 Arrow 1

Main Work Flow

AN EVENT LOG IS MANAGED BY A MINISTRY OF TRANSPORT COORDINATOR,
EVENT DETAILS ARE BEING REVIEWED IN COLLABORATION WITH OPERATORS

Every event requires time and effort, and when there are several at once, with the need to complete them quickly, it can be stressful

bottom of page